Customer List of Completed Jobs
The projects listed below show applications completed by Valade Heating & Cooling, Inc. These projects are currently up and running. They include industrial commercial applications ranging from computer rooms to water treatment facilities. Dates range from 1988 to the present.
Project Name
|
General Contractor
|
Contract
Amount
|
Date
Job # |
|
A.A. Stagg High School Palos Hills, IL. |
K. Keup Construction
(Underground pipe) |
$85,500.00 |
09/08/00 00-83 |
|
Aaron’s Shopping Center Gary, IN |
RTU and Ductwork Change Out
|
$79,026.50 |
09/30/04 04-050 |
|
Abbott Adhesives Chicago, IL. |
V.H.C. |
$3,510.00 |
02/12/98 98-132 |
|
Addison Pressure Adjusting
Station Addison, IL. |
Cecchin Plumbing
|
$44,000.00 |
03/06/91 91-025 |
|
Allied Waste Industries Crestwood, IL |
V.H.C.
Computer Room |
$9,100.00 |
01-074 |
|
Air Design Services Bolingbrook, IL. |
Taco Bell
|
$97,000.00 |
08/04/98 98-423 |
|
Alpharma |
Dennis Cole
(Fabricate metal in shop) |
$3,500.00 |
02/26/99 99-029 |
|
American Legion Lansing, IL. |
V.H.C. |
$5,000.00 |
10/29/93 93-114 |
|
Automatic Data Processing Elk Grove Village, IL 6007 |
Computer Room Plenums Liebert Compressor Change
Out |
$14,800.00 $6,250.00 |
04-043 04-059 |
|
Baby Super Store Lansing, IL |
Abrams Construction |
$35,000.00 |
09/08/95 95-256 |
|
Barnhart, Tom |
V.H.C. |
$3,240.00 |
06/04/98 98-287 |
|
Barge Co. Joliet, IL |
VHC |
$10,300.00 |
10/31/03 03-039 |
|
Barron House St. Charles, IL. |
V.H.C. |
$7,500.00 |
12-20-00 00-011 |
|
Bedford Park W.W.T.P. 6601 Old Harlem Av e Bedford Park, IL |
R & W Construction
|
$30,000.00 |
91-091 |
|
Berwyn Public Works 6700 West 30th
Street Berwyn, IL. |
Wil-Freds Construction |
$56,500.00 |
88-102 |
|
Bivona Medical
Technologies Gary, IN. |
Field Tech. (Install Exhaust Fan) V.H.C
(Relocate existing HVAC
equipment) |
$1,153.00 $12,950.00 |
08/09/99 99-106 08-31-02 02-048 |
|
Blastech Gary, IN |
V.H.C. (Replace Furnace) V.H.C. Vent. Project |
$2,550.00 $10,500.00 |
09-19-01 01-111 10-23-01 01-125 |
|
Blout, Dave Monon, IN. |
V.H.C. (Furnace install) |
$2,925.00 |
10/18/99 99-1126 |
|
Bono, Dr. |
V.H.C. |
$2,000.00 |
04/07/95 95-021 |
|
Bombay Company Merrillville, IN |
Eagle
|
$30,000.00 |
02/05/89 89-26 |
|
Bradley Booster Station Bradley, IL |
Bowen Engineering
|
$4,372.00 |
08/07/00 00-072 |
|
Burger King 2222 S.Stoney Island Roosevelt & Wabash Chicago, IL. |
D.A.S. D.A.S. / V.H.C. |
$3,700.00 $22,738.00 |
11/19/93 93-123 11/19/93 93-124 |
|
Burger King Joliet, IL. |
Handon
|
$2,293.00 |
06/24/88 88-31 |
|
C.C.P. Indiana Harbor Portage, IN. |
V.H.C. Gossman Eng. Inc. |
$2,595.00 |
02/20/01 01-019 |
|
Cabot Aurora, IL. |
V.H.C. (Downtown – Stainless
Steel vent Meccon
(Chillers) Meccon
(Clean Room) V.H.C. (Wind Baffles) V.H.C. (Exhaust Fan & S.S.
Duct System Meccon
(Ventilation for Air
Compressor) V.H.C. (Install Fume Exhaust
Hood) V.H.C. (Install Mixer#6 & 7) VHC FRP Pipe & Exhaust Fan |
$9,450.00 $24,750.00 $8,850.00 $4,550.00 $3,160.00 $12,750.00 $4,460.00 $12,000.00 $9,855.00 |
01/24/01 01-009 02/01/00 00-008 04/25/00 00-039 12/15/00 00-108 01-003 00-039 01-039 01-137 02-048 |
|
Calumet City Fire
Department Calumet City, IL |
V.H.C. Rooftop Replacement |
$29,090.00 |
01-075 |
|
Calumet Machine and
Welding Shop Highland, IN. |
V.H.C. |
$12,200.00 |
01/08/99 98-474 |
|
Café Borgia Lansing, IL. |
V.H.C. |
$12,000.00 |
07/29/91 91-069 |
|
Colucci’s Pizza Lansing, IL. |
V.H.C. |
$3,000.00 |
05/17/91 91-048 |
|
Canal Barge Co. Joliet, IL |
VHC |
$13,215.00 |
03-039 |
|
Candy Company Chicago, IL |
V.H.C. |
$12,500.00 |
05/11/93 99-063 |
|
Cannon Steel Chicago, IL |
Cannon Steel Erectors
Per Pat Clark |
$1,200.00 |
01/10/91 91-003 |
|
Canteen Corporation 1925 – 177th
Street Lansing, IL. |
Canteen Corp. 708-895-6000 (Repair Cooler) |
$747.00 |
02/08/99 99-023 |
|
Cargill Industrial Oils
& Lubricants Chicago, IL |
V.H.C. (Repair HVAC Equipment) |
$7,294.00 |
02-28-01 01-057 |
|
Carlen Corp Hammond, IN |
V.H.C. |
$8,900.00 |
12-31-00 |
|
Carmart Drawing |
Miller Construction |
$400.00 |
00-060 |
|
Carol Stream Waste Water Treatment Plant Carol Stream, IL |
Lombard Construction
|
$15,000.00 |
12/10/90 90-063 |
|
Carroll Chevrolet 18 North Main Street Crown Point, IN |
Taylor and Taylor
|
$30,000.00 |
01/23/89 89-014 |
|
Chicago Board of Education 1819 West Perishing Road Chicago, IL |
Abbey Electric Co. |
$16,900.00 |
05/27/88 88-26 |
|
Chicago City Hall Chicago, IL |
Blinderman Construction |
$6,500.00 |
03/01/00 00-017 |
|
Chicago Heights Ford Chicago Heights, IL |
V.H.C. |
$2,100.00 |
02/19/93 |
|
Chicago Transit Authority Chicago, IL |
V.H.C. (Tank removal and
renovation) |
$47,800.00 |
08/20/98 98-450 |
|
Clevis Hagan Valparaiso, IN |
V.H.C. (Heat & Cool Rooftop) |
$3,975.00 |
04/19/99 99-051 |
|
Concrete Tech Lynwood, IL |
V.H.C. |
$7,651.00 |
03/08/00 00-019 |
|
Commercial Lighting Co. 245 Fencl Lane Hillside, IL |
Advantage Mechanical Rooftop Change |
$12,000.00 |
05-01-01 01-052 |
|
Consumer Illinois Water Co University Park, IL |
V.H.C. |
$15,000.00 |
11/28/94 94-073 |
|
Coupling Cover (Cabot) Tuscola, IL |
Meccon |
$2,500.00 |
10/13/99 99-124 |
|
Crafts for Less Lansing, IL |
Greg Severin
|
$25,000.00 |
04/30/96 96-106 |
|
Creative Hair Styling Highland, IN |
V.H.C. |
$10,000.00 |
07/02/93 93-088 |
|
Crown Point WWTP Crown, IN |
Bowen Engineering |
$24,300.00 |
03-110 04/20/05 |
|
Davies Imperial Hammond, IN |
V.H.C. (Replace Unit #9 Cabot
Bldg.) (C02 proble |