The projects listed below show applications completed by Valade Heating & Cooling, Inc. These projects are currently up and running. They include industrial commercial applications ranging from computer rooms to water treatment facilities. Dates range from 1988 to the present.
|
Project Name
|
General Contractor
|
Contract
Amount
|
Date
Job #
|
|
A.A. Stagg High School
Palos Hills, IL.
|
K. Keup Construction
(Underground pipe)
|
$85,500.00
|
09/08/00
00-83
|
|
Aaron’s Shopping Center
Gary, IN
|
RTU and Ductwork Change Out
|
$79,026.50
|
09/30/04
04-050
|
|
Abbott Adhesives
Chicago, IL.
|
V.H.C.
|
$3,510.00
|
02/12/98
98-132
|
|
Addison Pressure Adjusting Station
Addison, IL.
|
Cecchin Plumbing
|
$44,000.00
|
03/06/91
91-025
|
|
Allied Waste Industries
Crestwood, IL
|
V.H.C.
Computer Room
|
$9,100.00
|
01-074
|
|
Air Design Services
Bolingbrook, IL.
|
Taco Bell
|
$97,000.00
|
08/04/98
98-423
|
|
Alpharma
|
Dennis Cole
(Fabricate metal in shop)
|
$3,500.00
|
02/26/99
99-029
|
|
American Legion
Lansing, IL.
|
V.H.C.
|
$5,000.00
|
10/29/93
93-114
|
|
Automatic Data Processing
Elk Grove Village, IL 6007
|
Computer Room Plenums
Liebert Compressor Change Out
|
$14,800.00
$6,250.00
|
04-043
04-059
|
|
Baby Super Store
Lansing, IL
|
Abrams Construction
|
$35,000.00
|
09/08/95
95-256
|
|
Barnhart, Tom
|
V.H.C.
|
$3,240.00
|
06/04/98
98-287
|
|
Barge Co.
Joliet, IL
|
VHC
|
$10,300.00
|
10/31/03
03-039
|
|
Barron House
St. Charles, IL.
|
V.H.C.
|
$7,500.00
|
12-20-00
00-011
|
|
Bedford Park W.W.T.P.
6601 Old Harlem Av e
Bedford Park, IL
|
R & W Construction
|
$30,000.00
|
91-091
|
|
Berwyn Public Works
6700 West 30th Street
Berwyn, IL.
|
Wil-Freds Construction
|
$56,500.00
|
88-102
|
|
Bivona Medical Technologies
Gary, IN.
|
Field Tech.
(Install Exhaust Fan)
V.H.C
(Relocate existing HVAC equipment)
|
$1,153.00
$12,950.00
|
08/09/99
99-106
08-31-02
02-048
|
|
Blastech
Gary, IN
|
V.H.C.
(Replace Furnace)
V.H.C.
Vent. Project
|
$2,550.00
$10,500.00
|
09-19-01
01-111
10-23-01
01-125
|
|
Blout, Dave
Monon, IN.
|
V.H.C.
(Furnace install)
|
$2,925.00
|
10/18/99
99-1126
|
|
Bono, Dr.
|
V.H.C.
|
$2,000.00
|
04/07/95
95-021
|
|
Bombay Company
Merrillville, IN
|
Eagle
|
$30,000.00
|
02/05/89
89-26
|
|
Bradley Booster Station
Bradley, IL
|
Bowen Engineering
|
$4,372.00
|
08/07/00
00-072
|
|
Burger King
2222 S.Stoney Island
Roosevelt & Wabash
Chicago, IL.
|
D.A.S.
D.A.S. / V.H.C.
|
$3,700.00
$22,738.00
|
11/19/93
93-123
11/19/93
93-124
|
|
Burger King
Joliet, IL.
|
Handon
|
$2,293.00
|
06/24/88
88-31
|
|
C.C.P.
Indiana Harbor
Portage, IN.
|
V.H.C.
Gossman Eng. Inc.
|
$2,595.00
|
02/20/01
01-019
|
|
Cabot
Aurora, IL.
|
V.H.C.
(Downtown – Stainless Steel vent
Meccon
(Chillers)
Meccon
(Clean Room)
V.H.C.
(Wind Baffles)
V.H.C.
(Exhaust Fan & S.S. Duct System
Meccon
(Ventilation for Air Compressor)
V.H.C.
(Install Fume Exhaust Hood)
V.H.C.
(Install Mixer#6 & 7)
VHC
FRP Pipe & Exhaust Fan
|
$9,450.00
$24,750.00
$8,850.00
$4,550.00
$3,160.00
$12,750.00
$4,460.00
$12,000.00
$9,855.00
|
01/24/01
01-009
02/01/00
00-008
04/25/00
00-039
12/15/00
00-108
01-003
00-039
01-039
01-137
02-048
|
|
Calumet City Fire Department
Calumet City, IL
|
V.H.C.
Rooftop Replacement
|
$29,090.00
|
01-075
|
|
Calumet Machine and Welding Shop
Highland, IN.
|
V.H.C.
|
$12,200.00
|
01/08/99
98-474
|
|
Café Borgia
Lansing, IL.
|
V.H.C.
|
$12,000.00
|
07/29/91
91-069
|
|
Colucci’s Pizza
Lansing, IL.
|
V.H.C.
|
$3,000.00
|
05/17/91
91-048
|
|
Canal Barge Co.
Joliet, IL
|
VHC
|
$13,215.00
|
03-039
|
|
Candy Company
Chicago, IL
|
V.H.C.
|
$12,500.00
|
05/11/93
99-063
|
|
Cannon Steel
Chicago, IL
|
Cannon Steel Erectors
Per Pat Clark
|
$1,200.00
|
01/10/91
91-003
|
|
Canteen Corporation
1925 – 177th Street
Lansing, IL.
|
Canteen Corp.
708-895-6000
(Repair Cooler)
|
$747.00
|
02/08/99
99-023
|
|
Cargill Industrial Oils & Lubricants
Chicago, IL
|
V.H.C.
(Repair HVAC Equipment)
|
$7,294.00
|
02-28-01
01-057
|
|
Carlen Corp
Hammond, IN
|
V.H.C.
|
$8,900.00
|
12-31-00
|
|
Carmart Drawing
|
Miller Construction
|
$400.00
|
00-060
|
|
Carol Stream Waste Water
Treatment Plant
Carol Stream, IL
|
Lombard Construction
|
$15,000.00
|
12/10/90
90-063
|
|
Carroll Chevrolet
18 North Main Street
Crown Point, IN
|
Taylor and Taylor
|
$30,000.00
|
01/23/89
89-014
|
|
Chicago Board of Education
1819 West Perishing Road
Chicago, IL
|
Abbey Electric Co.
|
$16,900.00
|
05/27/88
88-26
|
|
Chicago City Hall
Chicago, IL
|
Blinderman Construction
|
$6,500.00
|
03/01/00
00-017
|
|
Chicago Heights Ford
Chicago Heights, IL
|
V.H.C.
|
$2,100.00
|
02/19/93
|
|
Chicago Transit Authority
Chicago, IL
|
V.H.C.
(Tank removal and renovation)
|
$47,800.00
|
08/20/98
98-450
|
|
Clevis Hagan
Valparaiso, IN
|
V.H.C.
(Heat & Cool Rooftop)
|
$3,975.00
|
04/19/99
99-051
|
|
Concrete Tech
Lynwood, IL
|
V.H.C.
|
$7,651.00
|
03/08/00
00-019
|
|
Commercial Lighting Co.
245 Fencl Lane
Hillside, IL
|
Advantage Mechanical
Rooftop Change
|
$12,000.00
|
05-01-01
01-052
|
|
Consumer Illinois Water Co
University Park, IL
|
V.H.C.
|
$15,000.00
|
11/28/94
94-073
|
|
Coupling Cover (Cabot)
Tuscola, IL
|
Meccon
|
$2,500.00
|
10/13/99
99-124
|
|
Crafts for Less
Lansing, IL
|
Greg Severin
|
$25,000.00
|
04/30/96
96-106
|
|
Creative Hair Styling
Highland, IN
|
V.H.C.
|
$10,000.00
|
07/02/93
93-088
|
|
Crown Point WWTP
Crown, IN
|
Bowen Engineering
|
$24,300.00
|
03-110
04/20/05
|
|
Davies Imperial
Hammond, IN
|
V.H.C.
(Replace Unit #9 Cabot Bldg.)
(C02 problem)
(Storage Room – Latex Paint)
(Air Door, Clean Room #1 & #2 – Cool Room #1 & #2)
(New Addition, Latex
Paint Room, Lab)
Venting Water Ionization Room
|
$2,466.00
$1,295.00
$3,500.00
$35,000.00
$3,169.00
|
98-561
98-285
95-339
95-331
98-286
|
|
Digital Computers, Inc.
|
R.A. Morely, Co.
|
$850,000.00
|
1988
|
|
DuPage W.W.T.P.
|
Meccon
|
$12,320.00
|
99-128
|
|
Dyer Waste Water Treatment Plant
Dyer, IN 46311
|
Bowen Engineering
|
$100,000.00
|
01/07/92
|
|
Edgewood Apartments
Lansing, IL
|
V.H.C.
|
$11,500.00
|
03/06/95
95-011
|
|
Envirite Corporation
Harvey, IL
|
V.H.C.
(Exhaust Fan for Lab)
V.H.C.
(B-Vent for Machine in new building)
V.H.C.
(Install new Piping & Electrical for Labs)
V.H.C.
(Replace Rooftop)
V.H.C.
(ICP Lab)
VHC-Water Storage Fac.
|
$1,450.00
$400.00
$5,445.00
$7,110.00
$5,250.00
$8,750.00
|
97-402
98-168
01-067
01-071
01-103
03-114
|
|
FAA
Chicago, IL
McCook, IL
McCook, IL
|
V.H.C.
Paschen Construction
V.H.C.
Terminal Doppler
Gutierrez
|
$2,000.00
$20,000.00
|
95-014
94-145A
|
|
FAA
Midway Control Towner
|
V.H.C.
(Replace existing A/C Unit)
|
$12,770.00
|
02-049
|
|
Federal Express
Chicago, IL
|
Hasse Construction
|
$6,950.00
|
02-019
|
|
Faith Lutheran Church
4331 S. Arlington Heights
Arlington Heights, IL
|
Faith Lutheran Church
708-253-4840
|
$106,000.00
|
89-115
|
|
Family Dollar Store
Lansing, IL
|
Lutz, Briggs & Schultz
|
$21,790.00
|
01-131
|
|
First National Bank of IL.
Mokena, IL.
|
Lagestee-Mulder Construction
|
$67,740.00
|
97-406 &
99-071
|
|
Federal Express
Bridgeview, IL
|
Hasse Construction
(Install Exhaust Fan for Chem. Area)
|
$6,950.00
|
03-31-02
02-019
|
|
Florida Plastics
10200 Kedzie Ave
Evergreen Park, IL
|
V.H.C
(Two RTU Units)
(Office A/C)
(Replace Unit Heater)
(Replace RTU)
(Replace Carrier Spilt)
(Silk Screening Project)
|
$16,991.00
$2,527.00
$650.00
$1,325.00
$13,000.00
$11,520.00
$38,000.00
|
99-094
99-093
01-012
99-129
01-135
03-053
03-066
|
|
Ford Motor Credit Corp
2200 E. 170th Street
Lansing, IL
|
V.H.C.
|
$6,500.00
|
93-029
|
|
Forest Park District
Calumet City, IL.
|
Mertes Construction
|
$30,000.00
|
03/12/92
92-030
|
|
Franklin Van Buren
Parking Garage
Chicago, IL
|
Paschen Cons’t Inc.
|
$35,000.00
|
12/28/88
88-113
|
|
Freize Residence
Chicago, IL
|
Knudensen Construction
|
$795.00
|
10-11-01
01-119
|
|
Gary Waste Water
Treatment Plant
42nd and Johnson
Gary, IN
|
Bowen Engineering
|
$5,450.00
|
10/26/99
99-133
|
|
Gary W.W.T.P.
Gary, IN
|
V.H.C.
|
$
|
04/02/94
94-036
|
|
Gayety Candy Co.
Lansing, IL
|
VHC- New HVAC Systems
|
$15,250.00
|
06/04/04
|
|
Gayety Candy Co.
Lansing, IL
|
Install New Cooler & Freezer Units
|
$33,000.00
|
08/31/05
05-020
|
|
Glenbrook North High School
|
|
$33,500.00
|
04-053
06/14/05
|
|
General Jones Armory
Chicago, IL
|
Capital Development Board
Ventilation
|
$51,400.00
|
02-024
|
|
George O’Day Shops
Hammond, IN
|
V.H.C.
(Infra Red Heaters)
(Air Piping)
(Move Electric)
(Light Circuit)
(Exhaust fan)
(Rework Air Lines)
(Paddle Fans)
(Exhaust Hoods)
(Fabricate Hood)
(Relocate Fans and Hoods)
(MUA units, Air Piping & Gas Piping for New Blgd.)
|
$6,469.00
$2,597.00
$788.22
$100.00
$2,265.00
$150.00
$1,206.00
$3,240.00
$1,339.00
$2,265.00
$42,600.00
|
00-098
99-077
99-014A
99-014B
99-014C
99-014D
99-014E
99-014F
99-014G
99-014H
04-028
|
|
Grissom School
Bannes Fernway
Tinley Park, IL
|
Semford
|
$35,000.00
|
89-095
|
|
H.B. Fuller
7351 West Devon Drive
Tinley Park, IL
|
R.A. Morley Co
|
$100,000.00
|
04/07/91
91-037
|
|
H.B. Fuller
312 Hicks Road
Palatine, IL
|
R.A.Morley
H.B. Fuller
|
$12,000.00
$55,000.00
$100,000.00
$10,000.00
|
91-021
91-061
91-062
91-063
|
|
H. Wilson Co.
|
V.H.C.
(Compressor Change)
V.H.C
(Rooftop Change)
|
$3,975.00
$30,140.00
|
98-239
01-068
|
|
Hadady Machine
|
V.H.C.
(Heat Shield)
|
$577.00
|
98-422
|
|
Hawk Lincoln Mercury
Oak Lawn, IL
|
V.H.C.
|
887.00
|
03/04/99
99-033
|
|
Hazel Crest Maintenance
Garage
Hazel Crest, IL
|
Staunton Construction
|
$10,000.00
|
91-092
|
|
Hazel Crest School
Administration. Center
170th – Dixie Hwy
Hazel Crest, IL
|
Hazel Crest School
|
$100,000.00
|
04/16/90
90-021
|
|
Health Services
Library – UIC
West Polk St
Chicago, IL
|
Capitol Development Board
|
$235,000.00
|
05/17/99
99-068
|
|
Hotz Bernards
Lansing, IL
|
V.H.C.
|
$25,000.00
|
03/03/95
95-020
|
|
Howe Development
Tinley Park, IL
|
Capital Development Board
(Upgrade Fire/Safety)
|
$85,000.00
|
02/03/00
00-010
11/30/00
00-105
|
|
Illinois Tollway Authority
Chicago, IL
|
Soderland Brothers
(Duct Cleaning)
|
$11,000.00
|
01-099
|
|
Indiana American Water Co.
Gary, IN
|
Bowen Engineering
|
$67,500.00
|
05-23-01
01-091
|
|
I.S.G.
East Chicago, IN
|
Fabricate (19) Stainless Steel Spilt Adaptors
|
$8,800.00
|
03-31-03
03-002
|
|
Jeepers Restaurant
Lansing, IL
|
Prism Builders
|
$103,000.00
|
07/28/98
98-382
|
|
John Bannes School
16835 South Odell
Tinely Park, IL
|
Semford Construction
|
$170,000.00
|
1988
|
|
Joliet W.W.T.P.
Joliet, IL
|
Meccon Industries
|
$130,000.00
|
09/27/88
88-65
|
|
K-9 Car
Calumet City Police Dept
Calumet City, IL
|
V.H.C.
|
$2,400.00
|
08/09/93
93-098
|
|
Kankakee Federal
Kankakee, IL
|
Honeywell
|
$20,000.00
|
04/10/92
92-0447
|
|
Kay Manufacturing
Calumet City, IL
|
V.H.C.
(Exhaust Fan for Locker Room)
|
$3,830.00
$850.00
|
98-166
98-221
|
|
Kraft Manufacturing
1 Kraft Court
Glenview, IL.
|
R.A. Morley
|
$175,000.00
|
1988
|
|
Lagestee-Mulder
2nd Floor Office
Mokena Bank Bldg.
Mokena, IL
|
Lagestee-Mulder
|
$2,895.00
|
08/25/99
99-114
|
|
Lamp Shade Hours
Oak Park, IL
|
V.H.C.
|
$4,500.00
|
02/09/94
94-011
|
|
Land-O-Frost
|
V.H.C.
(New Exhaust System
|
$3,987.00
|
99-123
|
|
Lan Oak Park District
Lansing, IL
|
Cody Bauer
(Remodel Shower Rooms)
(Boiler Repair)
Preschool Renovation
|
$755.00
$4,450.00
$128,897.00
|
10/24/00
00-092
98-204
03-029
|
|
Lansing Police Department
Lansing, IL
|
Captain Keith Smith
(Radio Room Exhaust Fan)
V.H.C
(HVAC in Break room)
V.H.C.
(Temperature Control Consulting)
V.H.C.
(Radio Room Exhaust)
V.H.C.
(Dog Run)
(Shooting Range)
V.H.C.
(Dog Kennels)
|
$1,275.00
$3,245.00
$7,725.00
$1,980.00
$3,840.00
$2,495.00
$3,740.00
|
01/30/01
01-011
08/07/00
00-071
04/19/99
99-050
10/20/98
98-478
07-02-93
93-087
98-015
01-125
|
|
Lansing Post Office
Lansing, IL
|
V.H.C.
|
$1,850.00
|
04/20/95
95-023
|
|
La Salle Welding Shop
Chicago, IL
|
Ornelas Construction
|
$9,975.00
|
02-062
|
|
Le Jardin Condo’s
Schererville, IN
|
V.H.C.
(Garage Heat)
|
$21,961.00
|
12/04/00
00-106
|
|
Liberty Plaza
|
Galt Construction
|
$960.00
|
97-485
|
|
Lincoln Park Zoo
Birds of Prey
Chicago, IL.
|
Handon Construction
|
$25,000.00
|
02/18/88
88-12
|
|
Lincoln Park Zoo
Koala Exhibit
Chicago, IL
|
Chicago Park District
|
$15,000.00
$11,755.00
|
07/24/92
92-098
|
|
Lover’s Lane
|
Robert Slankey
(Repair RT6)
|
$500.00
|
99-018
|
|
Loyola Academy
Chicago, IL
|
Kudensen Construction
|
$15,400.00
|
10-10-01
01-117
|
|
M.C.I.
Willowsprings, IL
|
Meccon/Bowen
|
$40,000.00
|
01/14/92
92-003
|
|
Martin Luther Booster Station
Gary, IN
|
Bowen Engineering
|
$15,000.00
|
10/26/95
95-297
|
|
Meccon Industries
Tuscola, IL
|
V.H.C.
(Pipe for generator)
V.H.C.
(Coupling Cover)
V.H.C.
(Compressor Prob.)
V.H.C.
(Brackets)
V.H.C.
Dehumidifier Fitting
V.H.C.
(Fabricate of 10 Stainless Steel Enclosures)
|
$71,590.00
$1,200.00
$13,485.00
$111.00
$1,500.00
$4,300.00
|
01/26/00
00-005
99-124
08/11/99
99-109
98-248
01-056
01-105
|
|
Meccon Industries
Lansing, Il
|
V.H.C.
(Spilt Rings)
|
$2,240.00
|
06/11/01
01-078
|
|
Mega Fuel
Chicago, IL
|
Ornelas Constructions
HVAC System
|
$17,300.00
|
02-037
05-31-03
|
|
Metra Yard # 47
Chicago, IL
|
Holland Mechanical
|
$2,146.00
|
10/20/98
98-488
|
|
Merrillville Conservatory
Merrillville, IN
|
Bowen
|
$12,000.00
|
00-101
|
|
Metropolitan Water Reclamation District- Calumet
Chicago, IL
|
F.H. Paschen
|
$154,625.00
|
12/31/05
03-042
|
|
Midway Airport
Chicago, IL
|
Meccon
Labor & Material for the Passenger Loading Bridge Equipment
|
$81,000.00
|
05-31-04
03-010
|
|
Midway Airport
Chicago, IL
|
FAA
Replace Stand Alone Marv-Air Unit
|
$1,890.00
|
05-31-04
04-061
|
|
Midway Airport
Chicago, IL
|
Broadway Electric
Electric Locker
|
$36,485.00
|
04-075
02/08/06
|
|
Miller Foreign Car
Matteson, IL
|
V.H.C.
|
$133,046.00
|
09/21/98
98-468
|
|
Miller Oldsmobile
Matteson, IL
|
Miller Consolidated
|
$90,710.00
|
10/05/98
98-477
|
|
Miller V.W
Matteson , IL
|
Miller Consolidated
|
$10,450.00
|
06/28-99
99-090
|
|
National Machine Repair
Crete, IL
|
Lou Novelli
672-7711
|
$4,000.00
|
05/06/88
88-42
|
|
New Berwyn Middle School
Berwyn, IL
|
Monaco Mechanical
|
$565,000.00
|
03-060
06/01/05
|
|
New Buffalo WWTP
New Buffalo, MI
|
Bowen Engineering
|
$248,250.00
|
03-052
02/20/05
|
|
New York Apartments
|
Midwest Co
(Replace Dryer Exhaust)
V.H.C.
(Drain Pans)
V.H.C.
(Flue Pipe Repair)
V.H.C.
(Dampers)
|
$3,860.00
$500.00
$10,700.00
$5,000.00
|
01/29/01
01-101
03/05/01
01-022
00-099
04-024
|
|
O’Donnell, Tim
Lansing, IL
|
V.H.C.
|
$12,000.00
|
01/03/95
95-002
|
|
Office Depot
Lansing, IL.
|
Skinner & Broadbent
|
$36,000.00
|
10/09/96
96-326
08/04/98
98-424
|
|
Palmer’s House
|
V.H.C.
|
$3875.00
|
00-111
|
|
Palos Hills Library
Palos Hills, IL
|
Sommers Co.
|
$25,000.00
|
05/05/92
92-057
|
|
Peotone Fire Station
7550 Joliet
Peotone, IL
|
Semford Construction
|
$50,000.00
|
1990
|
|
Pizza Hut
2747North Milwaukee
Chicago, IL
|
Restaurant Specialties
|
$22,500.00
|
1988
|
|
Pier One Imports
Chicago, IL
|
Advanced Mechanical
|
$5,825.00
|
07-02-00
00-067
|
|
Planet Honda
Matteson, IL
|
Archineering
HVAC
|
$201,153.00
|
02-073
|
|
Reichart, R
Lansing, IL
|
V.H.C.
|
$4,500.00
|
03/24/95
95-016
|
|
Reichart, J
Lansing, IL
|
V.H.C
|
$8,000.00
|
03/24/95
95-017
|
|
Rensselaer Library
N. Van Rensselaer
Rensselaer, IN
|
IRAC. Mast & Son, Inc.
Runyan Roofing
|
$15,000.00
$12,000.00
|
10/15/93
93-110
08/17/92
92-105
|
|
Resthaven South
16300 Wausau
South Holland, IL
|
Semford Construction
|
$33,000.00
|
10/18/88
88-73
|
|
Rohodia Vessel #40
|
Field Tech
(Fabricate Plate)
|
$665.00
|
99-118
|
|
Roman Decorating
Calumet City, IL
|
Install spilt system for the computer room
|
$6,500.00
|
05/31/05
05-019
|
|
Roseland Pump Station
|
V.H.C.
(HVAC Install)
|
$8,075.00
|
1996
|
|
Ryder Truck Rental
1050 Pershing Road
Chicago, IL
|
Eagle Construction, Inc.
|
$35,000.00
|
12/22/88
88-108
|
|
Saddler Shoes
Lansing, IL
|
V.H.C.
|
$5,890.00
|
05/15/98
98-248
|
|
Safeco Corporation
6060 North West Highway
Chicago, IL
|
Semford Construction
|
$106,000.00
|
04/23/90
90-023
|
|
Sandridge Nature Center
15890 S. Paxton
South Holland, IL 60473
|
Mertes Construction
|
$100,000.00
|
92-030
|
|
Sara Lee
Chicago, IL
Stainless Steel Shelves
|
V.H.C.
|
$4,275.00
|
10/25/00
00-093
|
|
Scherer Management
|
V.H.C.
(Baseboard Heat)
|
$3,724.00
|
98-116
|
|
Schererville Pump Station
Schererville, IN 46375
|
Semford Construction
Bowen Construction
Semford Construction
|
$50,000.00
$10,500.00
$30,000.00
|
03/22/90
90-015
05-14-99
99-067
|
|
Schererville, Town of
Schererville, IN 46375
|
Hasse Construction
Grit Building
|
$20,720.00
|
02-004
04-15-04
|
|
Schroeder and Lauer
Lansing, IL
|
V.H.C.
|
$160.00
|
01/26/94
94-0002
|
|
Semdberg Machine Corp.
|
V.H.C.
(Install Heaters in the Locker room)
|
$3,480.00
|
98-005
|
|
Shannon, Peggy
Romeoville, IL
|
V.H.C.
|
$6,500.00
|
03/25/98
98-189
|
|
Sherwin Williams
Chicago, IL
|
Hasse Construction
|
$16,055.00
|
04/23/93
93-036
|
|
Shurgard Storage
Calumet City, IL
|
Acer Construction
|
$7,500.00
|
12/31/05
05-063
|
|
Siemens Westinghouse
|
V.H.C.
(Material)
|
$2,600.00
|
00-094
|
|
Silver Line
Lansing, IL
|
V.H.C.
|
$2,750.00
|
11/20/98
98-564
|
|
Smith, Jethroe
Munster, IN
|
V.H.C.
|
$12,000.00
|
03/03/95
95-010
|
|
Smith Medical Technologies
Gary, IN
|
VHC
|
160,000.00
|
04-051
01/21/05
|
|
South County Auto Body
Lansing, IL
|
V.H.C.
|
$5,000.00
|
09/07/90
90-043
|
|
South Water Purification
Chicago, IL
|
Bowen
FRP Pipe & Rework the existing Vent. System
|
$334,270.00
|
01-092
03-31-04
|
|
St. John Church
Hammond, IN
|
V.H.C.
(Rebuild Coil – A/coil)
V.H.C.
(A/C Unit for Kitchen)
|
$840.00
$6,147.00
|
98-128
01-138
|
|
St. John’s Evangelist Church
Flossmoor, IL
|
VHC
New Boiler System for the School
|
$40,000.00
|
03-116
|
|
St Victors Church
|
V.H.C.
(Chiller Piping Valve replacement)
|
$800.00
|
10/18/99
99-127
|
|
Statesville Correctional Facility
Joliet, IL
|
Capital Development Board
Ventilation
|
$399,800.00
|
02-029
|
|
Stickney Water Reclamation
Stickney, IL
|
Meccon Industries
|
$66,000.00
|
07/26/91
91-066
|
|
Subway
Jackson & Van Buren
Chicago, IL
|
Blindermen Construction
|
$47,900.00
|
05/07/97
97-127
|
|
Surpka, Len
Hammond, IN
|
V.H.C.
|
$150.00
|
12/09/00
98-605
|
|
Sushi – Doraku
|
Advantage Mechanical
HVAC Adjustment
|
$3,950.00
|
00-068
|
|
Switchboard Room
Chicago, IL
|
Meccon Industries
|
$16,275.00
|
01/09/99
99-007
|
|
Taco Bell
Various Locations
Chicago, IL
|
Restaurant Specialties
|
$88,000.00
|
1988
|
|
Taco Bell
Calumet City, IL
|
Air Design
|
$50,000.00
|
05/20/98
98-251
|
|
Tinely Park Mental Health Center
|
Capital Development Board
|
$27,5000
|
09-30-01
|
|
Tinley Park Creek
Forestry Building
147th & Oak Park Ave
Oak Forest, IL
|
Winterset Construction
|
$45,000.00
|
1988
|
|
Thorn Creek Water Basin
Chicago Heights, IL
|
Bowen Engineering
|
$10,060.00
|
02-077
|
|
Thornton Fractional
Science & Tech Lab
Calumet City, IL
|
V.H.C.
(Office Renovation)
V.H.C.
(Ductwork in Cad room)
V.H.C.
(Office Remodel)
|
$15,245.00
$7,889.00
$1,600.00
|
04/14/00
00-038
98-237
98-485
|
|
Thornton Fractional North
High School
Calumet City, IL
|
Century Construction
(Physics Lab Renovation)
V.H.C.
(Replacement of Thermostat)
V.H.C
(Steam Heater)
(Boiler # 1)
(Boiler #2-3)
V.H.C.
(Guidance Office)
V.H.C.
(Bathroom Exhaust)
V.H.C.
(Compressor Change)
|
$42,660.00
$784.00
$5,998.00
$5,658.00
$5658.00
$3,290.00
$975.00
$694.00
|
04/28/00
00-042
05/17/99
99-070
99-083A
99-083B
99-083C
99-112
98-271
98-468
|
|
Thornton Fractional South High School
Lansing, IL
|
V.H.C.
(Nurses Office)
V.H.C.
(Guidance Office)
V.H.C.
(Mainframe Computer Room)
V.H.C
(201 Computer Room)
V.H.C.
(Bathroom Exhaust Fans)
V.H.C.
(Clean Ductwork)
V.H.C.
(Roof Fan)
V.H.C.
(Alternate #1)
|
$5,095.00
$8,334.00
$1,875.00
$5,500.00
$3,569.00
$1,425.00
$5,500.00
$3,000.00
$1,100.00
$575.00
|
04/21/99
99-053
4/21/99
99-056
06/18/99
99-084
05/30/98
98-281
98-283
98-383
95-247
95-248
98-386
95-249
|
|
Torrence Avenue Discount Liquors’
Lynwood, IL
|
V.H.C.
|
$504.00
|
03/08/00
00-020
|
|
UPS
Alsip, IL
|
Ornelas Construction
|
$53,978.00
|
02-039
|
|
University of Illinois
Matteson, IL
|
Miller Consolidated
Dennis Dills
|
$65,790.00
|
03/22/99
99-040
|
|
University of Illinois
Matteson, IL
|
Miller Consolidated
( Addition )
|
$750.00
|
07/30/99
99-105
|
|
University Of Illinois
Chicago Circle Center
|
V.H.C.
(Ventilation)
|
$535,660.00
|
04-13-01
01-042
|
|
University Of Illinois
Library Of Health Sciences
|
Capital Development Board
|
$325,000.00
|
05-31-00
99-068
|
|
University Of Illinois
Warehouse Project
Chicago, IL
|
Meccon Industries
(Replace Rooftops and Exhaust Fan)
|
$223,115.00
|
12-31-01
01-038A
|
|
University Of Illinois
Warehouse Project
Chicago, IL
|
Oakbrook Mechanical
(Install New B-Vent Stacks)
|
$21,980.00
|
12-31-01
01-038B
|
|
University Park Waste Water Treatment Plant
University Park, IL
|
Chappell Construction
|
$25,000.00
|
12/16/93
93-133
|
|
University Of Illinois
Chicago, IL
Science & Engineering Lab
|
Meccon Industries
|
$8,900.00
|
01-087
|
|
University Of Illinois
Chicago, IL
|
Meccon Industries
(Reclaim Carrier Chiller)
|
$1,500.00
|
05-23-01
01-091
|
|
University Of Illinois
Chicago, IL Chemistry Exhaust Addition
|
V.H.C.
|
$22,550.00
|
02-078
|
|
University Of Illinois
Chicago, IL Chemistry Lab
|
VHC
|
$147,500.00
|
02-026
|
|
University Of Illinois
Chicago, IL
Chicago Circle Center-3rd/4th Floor
|
VHC
|
$152,993.00
|
03-014
|
|
University Of Illinois
Medicine Restoration
Chicago, IL
|
Brongiel Plumbing
|
$7,000.00
|
04-013
|
|
University of Illinois
Pathology Lab
|
VHC
|
$33,100.00
|
04-008
04/02/05
|
|
Urban Media
Chicago, IL
|
Meccon
(Refrigeration Piping)
(Sheet metal)
|
$157,000.00
|
05/24/00
00-049A
06/20/00
00-049B
|
|
Van Dyne Crotty
South Holland, IL
|
Field Tech
(Repair Commercial Dryer)
(Office Diff. Remove)
(Boiler Breechings)
(Steam Tunnel)
Concrete Tech
(Office Diff. Change)
|
$275.00
$5,140.00
$390.00
$1,597.00
$3,950.00
$100.00
|
99-001
99-002
99-003
99-015
99-216
99-017
|
|
Van Dyne Crotty
(continue)
|
Concrete Tech
(Office Diff. Change)
Field Tech
(Stainless Steel Drop Pan)
(Gas Regulator and Funnel)
(Fabricate and install vent steam)
(Roof exhaust)
(2-Unit heaters Laundry area.)
|
$3,950.00
$100.00
$825.00
$2,182.00
$11,592.00
$11,400.00
$5,480.00
|
99-003
99-015
99-216
99-017
98-632
98-633
99-020
|
|
Van Leer Containers, Inc.
4300 West 130th Street
Chicago, IL
|
Ron Krass
Alsip, IL.
|
$60,000.00
|
11/11/93
93-118
|
|
Van Noort
Lansing, Il
|
V.H.C.
|
$5,187.00
|
08/11/99
99-108
|
|
White Castle
Mokena, IL
|
Sundene Construction
|
$8,500.00
|
1996
|
|
White Castle
Country Side, IL
|
V.H.C.
(Rooftop & Charge)
|
$9,395.00
|
06/06/00
00-054
|
|
White Castle
183rd & Halstead
Chicago, IL
|
Tom Bouie
|
$895.00
|
01/20/99
00-009
|
|
White Castle
Store #50
Joliet, IL
|
White Castle Systems
(HVAC problem)
|
$13,517.00
|
08/10/99
99-107
|
|
White Castle
Merrillville, IN
|
V.H.C.
V.H.C
(Fryer Exhaust)
V.H.C.
(Exhaust Fan)
|
$1,664.00
$1,975.00
$2,600.00
|
98-133
99-008
98-215
|
|
White Castle
Lombard, IL
|
Arlington Construction
|
$20,715.00
|
08/24/98
98-562
|
|
White Castle
73rd
Chicago, IL
|
V.H.C
(Rework Kitchen Exhaust)
V.H.C
(Exhaust Fans over Freezer)
White Castle Systems
(Cooler, Freezer Renovation)
|
$2,985.00
$4,490.00
$144,500.00
|
98-130
98-131
00-014
|
|
White Castle
Aurora, IL
|
V.H.C.
|
$8,995.00
|
08/03/93
93-097
|
|
White Castle
Harlem & Milwaukee
|
V.H.C.
|
$23,025.00
|
98-451
|
|
William E. Brazley
Matteson, IL
|
VHC- Design Build HVAC Systems
St. James’ Office Roseland Daycare
Bethel AME
Dr. Mihajlvic’s Office
|
$640.00
$5,300.00
$5,300.00
$640.00
|
03-067
03-081
03-078
04-010
|
|
Wojak, Brian Home
|
V.H.C.
(HVAC in new home)
|
$20,640.00
|
99-079
|
|
Wigdahl Electric
Elk Grove Village, IL
|
Tom Wigdahl
708-439-8200
|
$500,000,00
|
1988
|
|